Completed September 2025 · Bathroom renovation
Full bathroom renovation
A dated four-piece bathroom taken back to the studs and rebuilt as a walk-in shower room. The original tub, beige wall tile and vanity were removed, the wet area was waterproofed and re-tiled in large-format porcelain, and the layout was reworked around a frameless glass shower.
What the work involved
- Removed the original tub, wall tile and vanity
- Waterproofed and re-tiled the wet area in large-format marble-look porcelain
- Frameless glass walk-in shower with rainfall and handheld heads
- Recessed shower niche and matte black fixtures throughout
- Floating vanity with quartz top and undermount sink
- Backlit LED mirror and new lighting
- Grab bars set into blocking for safe, long-term use
Photographs taken on site by DnA Appt.